Tunnel dels 3 Ponts (Lleida)

Euroconsult, specialist in underground works, is carrying out auscultation work in the construction of the Tunnel dels 3 Ponts, hired by the construction company.
Read more

Avalanche protection gallery at CG3. Phase 5

This new section of the gallery corresponds specifically to the fifth and last phase of the work, giving continuity to the protection works tendered by the Ministeri d'Ordenament Territorial during the last years. The main objective of this work is to protect the users of the CG number 3 that...
Read more

Final straight for Andorra to have a GREEN INFRASTRUCTURE NETWORK (XIVA)

At the beginning of August EUROCONSULT-SUPPORT UTE delivered to the Ministry of the Environment, Agriculture and Sustainability the sectoral Plan related to Andorra's green infrastructure network for its final review. This network is based on an integrated and continuous set of routes and spaces...
Read more

IX National Symposium on unstable slopes (Santander, June 2017)

Euroconsult, consolidated experience in Natural Risks The Andorran company EUROCONSULT, created in 1990, is committed to international participation in Natural Risks to improve the quality of its studies. EUROCONSULT defends the importance of the continuous training of its work team,...
Read more

Paving control of the Andorran's roads

"Campaign for general, secondary and street pavements. Year 2017 ". In these works, Euroconsult is carrying out the Faculty's management of the work, together with the horizontal signage works. In the photo you can observe the execution of a technical inspection for execution of a section of the...
Read more | All the news
Tunnels projects and geotechnical projects related to hazards and modifications of the natural land
Emphasis on the falling of rocky blocks, tunnels, landfills, large-scale site-clearing, embankment and soil drainage ...
Studies related to the building of new plants, excavation projects and modification of the current state of the soil…
Measure the environmental impact and plan in advance the project adjustments and preventive...
Analysis and natural unfavourable contingencies’ management to which we are exposed…
Specifying who, when and which associated procedures and resources have to be implemented to a project...
Knowing the characteristics of a specific movement and the soil activity level, if it moves or remains stable…
Studies of floods, erosion of the banks, discharges and hydraulic section estimation, water catchment…